The Challenge
Limited Time plus Emerging Technologies
Completed in only 8 months, including heavy construction to retrofit common space, the logistical coordination of all resources and the “just-in-time delivery” of products and systems required significant focus and management of all project resources from ZTransform including client staff and several trades. Plus, the still-evolving interoperability of ST2110 platforms, Dante audio infrastructure, IP intercom, and many entry-level technical operations staff, required a heightened risk awareness and mitigation strategies for any such items that might arise.
Due to the concurrent systems design and staging, and on-site construction efforts, ZTransform utilized a 3rd party warehousing facility to deliver all products to Dallas, where items could quickly be transferred to site as the construction team turned over the various technical rooms.
The on-site installation was an exercise in parallel process of detailed design, fabrication, installation, and testing to ensure all systems were configured and brought online immediately after their respective installations were complete. End User Training was performed while ZTransform technical staff were still on-site to ensure any anomalies or questions could be addressed without delay.